Configuration Management Process Area deals with the management of the work products and it involves their Identification, Control of their configuration (Version, Make, Model, etc.), Status Accounting (Listing, Version History, etc.) and conducting Audits. Now if we analyze the CM Process Area in context of the CMMI Models i.e. CMMI…
May 9, 2015
Service Continuity (SCON) is the capability and methodology to recover from a disruptive or disastrous situation. Example of disastrous situations explained in CMMI for Services (CMMI-SVC) Ver 1.3: Disruption to Infrastructure (i.e. Significant Equipment Malfunction, Building Collapse, etc.) Natural Disasters (i.e. Earthquake, Flood, Hurricanes, Tornados, etc.) Human events (i.e. Civil…
April 15, 2015
Although both terms i.e. Capacity and Availability looks similar to process practitioners who has just started the CMMI journey, but in actual these terms have different meaning and focus. Capacity Management is the management of the total capability or the maximum quantum of work that can be performed because capacity…
April 10, 2015
Service System Transition and Strategic Service Management Process Areas belong to the CMMI Maturity Level 3. Both of these have their focus on the services but from different point of view. In this post we will figure out the difference between them. Service System Transition (SST) Service System Transition (SST)…
April 3, 2015
As CMMI Consultants, if you come across the situation wherein you have to differentiate between CMMI Maturity Level 2 Service Delivery Process Area and CMMI Maturity Level 3 Service System Development Process Area, how will you do this? Essentially, as CMMI Consultants, do we essentially know the fundamental difference between…
March 25, 2015
A study was conducted by the SEI (now CMMI Institute) on the metrics data collected from 35 large organizations across the world. These organizations having low as well as high maturity apply CMMI Process Improvement practices to their Software Engineering, System Engineering and other Engineering activities. This study was conducted…
January 24, 2015
A study was conducted by the SEI (now CMMI Institute) on the metrics data collected from 35 large organizations across the world. These organizations having low as well as high maturity apply CMMI Process Improvement practices to their Software Engineering, System Engineering and other Engineering activities. This study was conducted…
January 20, 2015
A study was conducted by the SEI (now CMMI Institute) on the measurement data collected from 35 large organizations across the world. These organizations having low as well as high maturity apply CMMI Process Improvement practices to their Software Engineering, System Engineering and other Engineering activities. This study was conducted…
January 2, 2015
A study was conducted by the SEI (now CMMI Institute) on the metrics data collected from 35 large organizations across the world. These organizations having low as well as high maturity apply CMMI Process Improvement practices to their Software Engineering, System Engineering and other Engineering activities. In this study Global…
December 3, 2014
A study was conducted by the SEI (now CMMI Institute) on the metrics data collected from 35 large organizations across the world. These organizations having low as well as high maturity apply CMMI Process Improvement practices to their Software Engineering, System Engineering and other Engineering activities. In this study Global…
November 29, 2014
Rajendra's LinkedIn Profile
Rajendra is a qualified and certified Lead Appraiser and Instructor for the following :
Rajendra is Lead Assessor for ISO 9001 (QMS), ISO 14001 (EMS), OHSAS 18001 (OHSMS) since 1994
International Automotive Task Force (IATF) approved Lead Assessor for Automotive Standard TS 16949:2009
Lead Assessor for ISO 27001 (ISMS) and ISO 20000-1 (ITSM)
Rajendra has 25 years experience in the industry.