As a CMMI Consultant, during CMMI consulting assignment, you may be asked about the benefits of CMMI related to Cost of Quality, Estimation Accuracy, and Product Quality. CMMI Consultants may answer this question by taking input from the post below

CMMI FAQ 0


29th November, 2014

A study was conducted by the SEI (now CMMI Institute) on the metrics data collected from 35 large organizations across the world. These organizations having low as well as high maturity apply CMMI Process Improvement practices to their Software Engineering, System Engineering and other Engineering activities.

In this study Global Software Group (GSG) of Motorola Systems observed the effect of the CMMI Process Improvement initiative started by the organization. Customer’s satisfaction ratings during this period and afterward continued to be exceeded.

The quantitative data for improvement was collected from 170 projects from 2000 to 2005 and was maintained in a Motorola GSG central data warehouse.

Cost of poor quality

20141129 - 1. Cost of Quality

Figure – Cost of Quality

Due to improvement in verification process, cost of quality improved over a 36.5 percent from the pre-CMMI period and cost of poor quality remained under control and less than 5 percent through this period.

Faults per thousand lines of code

20141129 - 2. Cost of Quality

Figure – In Process Faults per Thousand Lines of Code

Due to improvement verification process, as seen cost of quality was reduced and as a result the product quality was improved. Verification process was enhanced with Causal Analysis and Resolution Process Area. All this lead to fewer defects injection and decrease in software faults per KLOC (Kilo Lines of Code) by 40.2 percent than pre-CMMI period.

Estimation Accuracy

20141129 - 3. Cost of Quality

Figure – Estimation Accuracy

During the process improvement activities like project planning, estimation and project monitoring were improved and that leads to the an improvement in effort estimation accuracy by 31.4 percent moving from SW-CMM Maturity Level 5 to CMMI Maturity Level 5. It was also observed that estimation accuracy for schedule was improved by 84.2%.

Overall Customer Satisfaction

20141129 - 4. Cost of Quality

Figure – Overall Customer Satisfaction

A delivery rate of 100% was maintained leading to high customer satisfaction ratings on project closure. On an average a score of over 9 (“excellent”) was maintained, which was less than 9 prior to the CMMI initiative. High customer satisfaction rating was a result of delivering cost effective, high quality products on time.

As a result of CMMI Implementation, Motorola GSG China was able to double the staff and was able to increase commercial business volumes by 55%.

This shows that CMMI Process Implementation can lead to reduced cost of quality, improvement in estimation accuracy, customer satisfaction and product quality.

Source: Performance Results of CMMI®-Based Process Improvement Report.

Share this:

  • Click to email a link to a friend (Opens in new window)
  • Click to print (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Tumblr (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)

Like this:

Like Loading...

Related


Published by CMMI Consultant


cmmi consultant, cmmi consultants, cmmi consulting, cost of poor quality, customer satisfaction, estimation accuracy



Previous Post

As a CMMI Consultant, during CMMI consulting assignment, you may be asked about the benefits of CMMI related to Defects Density. CMMI Consultants may answer this question by taking input from the post below:

Next Post

As a CMMI Consultant, during CMMI consulting assignment, you may be asked about the benefits of CMMI related Effective Audits, Lesser Defects, Higher Phase Containment Rate of Defects, Reduced Cost of Quality, Improvement in Customer Satisfaction. CMMI Consultants may answer this question by taking input from the post below

Leave a Reply Cancel reply


Sidebar


Author: Rajendra Khare


Rajendra's LinkedIn Profile
Rajendra is a qualified and certified Lead Appraiser and Instructor for the following :

  • SCAMPI High Maturity Lead Appraiser (Certified)
  • CMMI Institute-Certified SCAMPI v1.3 Lead Appraiser for Acquisition (Certified)
  • CMMI Institute-Certified SCAMPI v1.3 Lead Appraiser for Development (Certified)
  • CMMI Institute-Certified SCAMPI v1.3 Lead Appraiser for Services (Certified)
  • CMMI Institute-Certified Introduction to CMMI-DEV v1.3 Instructor (Certified)
  • CMMI Institute-Certified Services Supplement for CMMI-DEV Instructor (Certified)
  • CMMI Institute-Certified CMMI-DEV Level 2 for Practitioners Instructor (Certified)
  • CMMI Institute-Certified CMMI-DEV Level 3 for Practitioners Instructor (Certified)
  • CMMI Institute-Certified SCAMPI B & C Team Leader for Acquisition (Certified)
  • CMMI Institute-Certified SCAMPI B & C Team Leader for Development (Certified)
  • CMMI Institute-Certified SCAMPI B & C Team Leader for Services (Certified)

Rajendra is Lead Assessor for ISO 9001 (QMS), ISO 14001 (EMS), OHSAS 18001 (OHSMS) since 1994

International Automotive Task Force (IATF) approved Lead Assessor for Automotive Standard TS 16949:2009

Lead Assessor for ISO 27001 (ISMS) and ISO 20000-1 (ITSM)

Rajendra has 25 years experience in the industry.


Tags

cmmi cmmi-acq cmmi-dev cmmi-svc cmmi appraisal CMMI Assessment cmmi benefits CMMI Certification cmmi consultant cmmi consultants cmmi consulting cmmi faq CMMI for Acquisition cmmi for development cmmi for services cmmi high maturity cmmi implementation cmmi institute cmmi maintenance cmmi maturity level cmmi maturity level 2 cmmi maturity level 3 cmmi model cmmi process cmmi process improvement cmmi services configuration management dqs india high maturity Information Security iso 9001 maturity level metrics opd organizational training pal PPQA process improvement qms requirements management risk risk management sam sepg supplier agreement management

© 2023 Copyright © 2017 CMMI Consultant Blog.
Back to top
 

Loading Comments...
 

    %d bloggers like this: