As a CMMI Consultant, during CMMI consulting assignment, you may be asked about the benefits of CMMI related to Improvement in Schedule Targets, Post-Release Defect Density and Cost Savings to the End User. CMMI Consultants may answer this question by taking input from the post below:

CMMI FAQ 0


3rd March, 2015

A study was conducted by the SEI (now CMMI Institute) on the metrics data collected from 35 large organizations across the world. These organizations having low as well as high maturity apply CMMI Process Improvement practices to their Software Engineering, System Engineering and other Engineering activities.

This study involves The Tufts Health Plan, a health maintenance organization (HMO), was founded in 1979 as a not-for-profit organization. Before starting with SW-CMM and CMMI, it already has a Quality Management Framework covering system development and project delivery life cycle. It started SW-CMM effort in 2001 and it achieved a SW-CMM Maturity Level 3 in Dec, 2004. It also started its journey of CMMI in January 2005. As a result of the CMMI Process Improvement following improvements were observed:

Based on the Metrics Management system established by the organization, Process Performance at Org level was measured using the cumulative results of measurement in projects.

Reduction in defects

Defects Identified in Testing

Figure: Defects Identified in Testing

Testing conducted by Tufts Health Plan IT are of different types including unit, functional, systems and acceptance testing. As shown above there was an overall reduction in the defects identified on Testing by 44% and in the year 2004-2005 it was reduced by 16%.

Effective Peer Reviews

Total Issues Found in Peer Reviews

Figure: Total Issues Found in Peer Reviews

Peer reviews are part of the Quality Assurance activities performed at Tufts Health Plan. There was an increase of 68% in the number of peer reviews during 2004 and 2005. Number of issues found in the reviews increased by 59 percent. All this leads to the fixing of issues before reaching them to the customers.

Change Requests at Tufts Health Plan

Change Requests at Tufts Health Plan

Figure: Change Requests at Tufts Health Plan

As shown above, there was a reduction in the number of corrective change requests leading to more productive environment. Apart from this, the proportion of corrective change requests remained relatively low around 23% and there were 15% more total changes between 2004 and 2005.

Reduction in Total Production Issues

Production Issues at Tufts Health Plan

Figure: Production Issues at Tufts Health Plan

Product issues, number of issues occurred in the production processing environment, were reduced by 8% over the period 2004-2005 and by approximately by 50% during the year 20002-2005.

If we summaries these improvements, we can say that:

  • Reduction in defects found in testing by 16%
  • Increase in the number of peer reviews by 68%
  • Increase in peer reviews defects by 59%
  • Reduction in corrective change requests by 2%
  • Reduction in production issues by 8%

 

 

Share this:

  • Click to email a link to a friend (Opens in new window)
  • Click to print (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Tumblr (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)

Like this:

Like Loading...

Related


Published by CMMI Consultant


cmmi, cmmi consultant, cmmi process improvement



Previous Post

What is Security by Design with CMMI for Development?

Next Post

List of CMMI Courses and Conferences worldwide up to Aug, 2015

Leave a ReplyCancel reply


Sidebar


Author: Rajendra Khare


Rajendra's LinkedIn Profile
Rajendra is a qualified and certified Lead Appraiser and Instructor for the following :

  • SCAMPI High Maturity Lead Appraiser (Certified)
  • CMMI Institute-Certified SCAMPI v1.3 Lead Appraiser for Acquisition (Certified)
  • CMMI Institute-Certified SCAMPI v1.3 Lead Appraiser for Development (Certified)
  • CMMI Institute-Certified SCAMPI v1.3 Lead Appraiser for Services (Certified)
  • CMMI Institute-Certified Introduction to CMMI-DEV v1.3 Instructor (Certified)
  • CMMI Institute-Certified Services Supplement for CMMI-DEV Instructor (Certified)
  • CMMI Institute-Certified CMMI-DEV Level 2 for Practitioners Instructor (Certified)
  • CMMI Institute-Certified CMMI-DEV Level 3 for Practitioners Instructor (Certified)
  • CMMI Institute-Certified SCAMPI B & C Team Leader for Acquisition (Certified)
  • CMMI Institute-Certified SCAMPI B & C Team Leader for Development (Certified)
  • CMMI Institute-Certified SCAMPI B & C Team Leader for Services (Certified)

Rajendra is Lead Assessor for ISO 9001 (QMS), ISO 14001 (EMS), OHSAS 18001 (OHSMS) since 1994

International Automotive Task Force (IATF) approved Lead Assessor for Automotive Standard TS 16949:2009

Lead Assessor for ISO 27001 (ISMS) and ISO 20000-1 (ITSM)

Rajendra has 25 years experience in the industry.


Tags

cmmi cmmi-acq cmmi-dev cmmi-svc cmmi appraisal CMMI Assessment cmmi benefits CMMI Certification cmmi consultant cmmi consultants cmmi consulting cmmi faq CMMI for Acquisition cmmi for development cmmi for services cmmi high maturity cmmi implementation cmmi institute cmmi maintenance cmmi maturity level cmmi maturity level 2 cmmi maturity level 3 cmmi model cmmi process cmmi process improvement cmmi services configuration management dqs india high maturity Information Security iso 9001 metrics opd opm opp organizational training pal PPQA process improvement qms risk management sam sepg supplier agreement management training

© 2025 Copyright © 2017 CMMI Consultant Blog.
Back to top
 

Loading Comments...
 

    %d